Access the Full Project by Clicking here!
Bidjugde
JOB
Southern Blvd Reconstruction Phase I
BID DATE
07/10/18 - 10:00
AGENCY
Rio Rancho
ESTIMATE
n/a
SCOPE
The City of Rio Rancho is soliciting formal bids for the reconstruction of Southern Boulevard from 630' west of Golf Course Road to NM 528. The existing roadway pavement will be milled full depth and stockpiled at 2708 Iris Road NE. The new roadway section is a widened 4-lane divided roadway with raised median including left turn lanes, bike lanes, curb and gutter, sidewalk, multiuse trail, landscaping, and all appropriate signing and striping. Traffic signals will be replaced at 3900 Southern, Pinetree Road, Country Club Drive and Golf Course Road intersections. Permanent lighting will be installed along the corridor and at each intersection. Improvements also include an extensive storm drain system, which consists of inlets installed along Southern Boulevard, a series of storm drain pipes ranging from 24” to 96” and connecting to the existing storm drain system at NM 528.The project also includes replacement of the existing water lines paralleling Southern Boulevard on both sides of the roadway. Replacement of a segment of sanitary sewer forcemain and mainline (west end) and sewer services along the corridor.
PREBID
6/20/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT