Access the Full Project by Clicking here!
Bidjugde
JOB
Sierra Tank Bypass
BID DATE
05/24/18 - 2:00
AGENCY
Placerville
ESTIMATE
$375,000
SCOPE
Construction of two parallel water mainlines in a residential City street, installation of a new pressure reducing station, installation of a new 6-inch bulk water meter and precast concrete vault, and demolition, removal, and disposal of the existing water storage tank, hydropneumatic tank, filter house including tanks and enclosure, and valves and valve vaults. Work includes soil excavation, rock excavation, backfilling, concrete, pipefitting, paving, demolition and site restoration, and traffic control. The contractor shall be Class “A” licensed. cschiestel@cityofplacerville.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT