Access the Full Project by Clicking here!
Bidjugde
JOB
(DESIGN BUILD) Komatke Flood Control Phase I
BID DATE
09/18/18 - 5:00
AGENCY
GRIC
ESTIMATE
n/a
SCOPE
AWARD 7/30/18. The Project area is located in the upland areas of the Community. The Project encompasses designing and immediately constructing flood control and drainage infrastructure. Time is of the essence as the Village of Komatke repeatedly experience flooding. Immediate mitigation is needed. The Project should parallel concepts described in the Komatke Area Drainage Master Plan (“ADMP”) in an effort for regional flood control continuity, but not required so as to continually refine the ADMP. Inline and (or) offline retention or detention basin systems;  Piping if necessary;  Channeling;  Levees;  Spillways at basin outfall locations;  Sediment basins, traps, or other means to address sediment controls;  Cut off walls and other energy dissipation measures to prevent head-cut;  Utility relocation dependent on pre-30% designs;  Landscape amenities to address beautification;  Ecosystem restoration, water harvesting if feasible with environmentally sensitive infrastructure; Valerie.Bustos@gric.nsn.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT