Access the Full Project by Clicking here!
Bidjugde
JOB
Crosswalk Intersection Improvements
BID DATE
06/20/18 - 2:00
AGENCY
Los Altos
ESTIMATE
n/a
SCOPE
The project includes, but is not limited to, mobilization, traffic control, cold plane asphalt concrete pavement, hot mix asphalt paving, sidewalk replacement, curb and gutter replacement, driveway replacement, curb ramps, island passageways, concrete islands, pavement striping and markings, roadside signage, LED flashing stop signs, LED pedestrian crossing assembly, adjustment of utility covers, and all other items or details not mentioned above that are required by the Contract Drawings and Specifications to construct crosswalk and intersection improvements at various locations in the City of Los Altos.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT