Access the Full Project by Clicking here!
Bidjugde
JOB
Panchuela CG Host Site Water System Construction
BID DATE
07/19/18 - 5:00
AGENCY
Department Agriculture
ESTIMATE
n/a
SCOPE
• Demolition of a water hydrant & valves • Demolition of a 6'x6' pump house and concrete pad. • Furnish and install underground electric, water distribution piping, and sewer piping for a total of 350 ft. of trenching (Water Lines: 300 ft., Electric Lines: 205', Sewer Lines: 30'). Note: The numbers don't total 350 because some share the same trench. • Furnish and install 1 hydrant and 5 curb valves and boxes. • Locate and cap 2 existing water lines and tie new line into one existing line. • Furnish and install a water storage tank, hydropneumatic tank, water meter, booster pump, disinfection system, valves, hose bibs, unions, electrical pump controls and pump protection system inside an existing new pump house. • Excavate approx. 50 cubic yards of native material and embank approx. 10 cubic yards of compacted fill for the host site. • Furnish, place and compact 35 cubic yards of aggregate surface course and 10 cubic yards of crusher fines at the host site. • Furnish and install a host sewage holding tank with alarm and sewer piping. • Furnish and install Host Site accessories: 1 picnic table, 1 fire ring, 1 lantern holder, 1 wheel stop, 1 sewer inlet, and 1 electric/water RV pedestal. (jvaroz@fs.fed.us )
UPDATES