Access the Full Project by Clicking here!
Bidjugde
JOB
Trainer Simulator Improvements
BID DATE
07/29/13 - 10:00
AGENCY
AZDEMA
ESTIMATE
$150,000
SCOPE
Remove existing 10’ x 20’ x 9’ high overhead protection steel structure and 29 sq yd of unknown thickness concrete pad. Dispose of off site. Relocate existing street light and underground power line to avoid new concrete pads and shade structure. Provide same type of foundation, wiring, and accessories as existing. Construct two minimum support pads conforming to the Trainer Facilities Report for the NCM3 Trainer. Pad elevations to match. Slope pads no more than 1 % to avoid water ponding. Concrete finish Provide and install two recessed or flush mount tie downs per pad, capable of 25,000 pound load. Provide and install three ground rods with cables for attachment to trailer grounding lugs. Provide and install new subpanel from existing SES for two new 480V, 100 amp circuits conforming to the TFR, also provide drawings sealed by an engineer registered in Arizona confirming materials proposed and existing service capacity before construction begins. Locate and tap into existing water service to provide and install potable water line with valve for ¾” hose connection to trailer. Construct two suggested concrete pads conforming to the Trainer Facilities Report for the AVCATT Trainer. Pad elevations to match. Slope pads no more than 1 % to avoid water ponding. Concrete finish to be medium broom. Provide and install four recessed or flush mount tie downs per pad, capable of 25,000 pound load. Provide and install grounding system to accommodate central tie point p

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT