Access the Full Project by Clicking here!
Bidjugde
JOB
2017 18 Pavement Rehabilitation
BID DATE
06/12/18 - 2:00
AGENCY
Danville
ESTIMATE
$2,694,688
SCOPE
The work generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb, sidewalk, curb ramp, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of hot mix asphalt concrete, bridge approach repair, removal, removal and replacement of new traffic signal loop detectors, adjusting to grade of survey monument castings, water valve castings, storm drain and sanitary sewer manhole covers, and other utility lids, removal and replacement of existing pavement striping and markers, traffic control, and other items that are required by the plans, standard specifications, or these Special Provisions. nsalama@danville.ca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT