Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2018 Measure M Street Rehabilitation (REBID)
BID DATE
11/8/18 - 2:00
AGENCY
Berkeley
ESTIMATE
$3,000,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, adjustment of valve boxes and utility boxes, frames, and covers, protection and relocation of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, valley gutters, cross drains at curb ramps, storm drain pipe replacement, storm drain inlets, edge drain, base failure repairs, pavement milling, removal and disposal of pavement surfaces and base materials, subgrade preparation, proof rolling including over-excavation, stabilization and compaction, aggregate base course, hot-mix asphalt (HMA) paving, shoulder backing, and pavement markings, striping, and markers as specified. wwong@cityofberkeley.info
UPDATES