Access the Full Project by Clicking here!
Bidjugde
JOB
Water Projects
BID DATE
05/30/18 - 2:00
AGENCY
Mutton Hollow Improvement District
ESTIMATE
n/a
SCOPE
The Work associated with this project will connect the remaining service laterals from the 1999 project to the existing meters and the old transite main line will be abandoned. It is uncertain if the work done in 1999 included new services to all of the homes on Mutton Hollow Road from Boynton Road to Highway 89. This will need to be verified in the field. If missing, the Work will need to include the installation of new services from the 12 inch PVC C900 main to the existing meters. All fire hydrants will also be replaced and a few additional fire hydrants will be added. A new 8 inch PVC C900 main line will be installed on Ewe Turn along with new service laterals connected to the existing meters. A new 8 inch PVC C900 main line will be installed on Mutton Hollow Road from 944 East Kaysvillle (2500 East Layton) to Highway 89. This line will serve the upper pressure zone for the District and will connect at pump station near the existing culinary water reservoir at Highway 89. Project Area 2: 50 East from Mutton Hollow Road to 848 North A new 8 inch PVC C900 main line and services will be installed on 50 East. Fire hydrants will also be replaced. The existing transite main line will be abandoned. Project Area 3: Mutton Hollow Road from 50 East to Thornfield Road Services from Boynton Road to Thornfield Road will be connected to the existing meters as discussed in Project Area 1 above. New services will be installed as needed to ensure that all homes are connected to the 12 inch PVC main constructed in 1999. A new 8 inch PVC C900 main line will be installed on Mutton Hollow Road from 50 East to Boynton Road. The existing transite main line will be abandoned. Fire hydrants will be replaced. Project Area 4: Boynton Road A new 8 inch PVC C900 main line will be installed on Boynton Road from Mutton Hollow Road to the south. New service laterals will also be installed and the existing transite main line will be abandoned. A new 4 inch PVC C900 main line will be installed on Boynton Road from Mutton Hollow Road to the north. New service laterals will be installed and the existing transite main line will be abandoned. https://jonescivil.com/projects/water-projects/ Mutton Hollow Improvement District frankf@muttonhollowwater.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT