Radium Springs Water System Improvements
BID DATE
06/21/18 - 2:00
AGENCY
Dona Ana MDWCA
ESTIMATE
n/a
SCOPE
The Project consists the installation of approximately 44,000 LF of 6-inch waterline, 3,700 LF of 8-inch waterline, connections to the existing water system, installation of valves, fire hydrant assemblies, replacement of well pumps, rehabilitation of existing welded steel storage tanks, construction of a new booster station and accompanying appurtenances. The project will also include installation of new waterline inside steel casing within the NMDOT ROW by trenchless installation methods and connecting the existing water meters to the new water line. Souder Miller Alfredo Holguin <alfredo.holguin@soudermiller.com >