Water Service Replacements Asphalt Overlays Garden Lakes Washington Street
BID DATE
05/31/18 - 1:00
AGENCY
Avondale
ESTIMATE
n/a
SCOPE
The Work included in this Project consists of (A) replacing the existing 3/4-inch water service lines from the water mains up to and including the meter boxes; (B) completing asphalt repairs, milling, crack-seal and other prep, then placing a two-inch asphalt overlay course on the streets; (C) replacing and upgrading the existing sidewalk ramps to current ADA standards; and (D) replacing miscellaneous concrete. Tiffany Copp tcopp@avondale.org 623-333-4213
PREBID
5/16/2018 10:00