Access the Full Project by Clicking here!
Bidjugde
JOB
Intersection Improvements N Olive Wayside
BID DATE
06/5/18 - 2:00
AGENCY
Turlock
ESTIMATE
$536,000
SCOPE
The work consists, in general, of: pavement grinding, demolition of concrete and asphalt surfaces, installation of minor concrete curb, gutter, and sidewalk, roadway widening, hot mix asphalt pavement, installation of new traffic signal equipment including conduit, conductors, traffic signal poles and mast arms, pedestrian push buttons, pedestrian countdown heads, roadway lighting, traffic signal cabinet and controller and furnishing all necessary labor, materials, tools, equipment and incidentals needed to construct the improvements as shown on the contract plans complete and in place. Technical Contact: Stephen Fremming, P.E. Contact Email: sfremming@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT