Fish Creek AOP Bridge
BID DATE
05/8/19 - 5:00
AGENCY
Department Agriculture
ESTIMATE
$1,000,000
SCOPE
The selected contractor shall furnish all labor, equipment, and materials to accomplish the work under this contract. Work includes the following: 1. Demolish and remove the existing 15' Wide by 8' High by 70' Long culvert arch pipe. 2. Clear and grub vegetation as required within the clearing limits of the project. 3. Excavate the road prism to provide the stream channel as shown on the drawings. 4. Furnish adn install a new 58' span precast pre-stressed concrete road bridge with case in place concrete abutments, guard rails, and approach rails as shown on the drawings. 5. Furnish and install riprap for slope and abutment protection. 6. Patch pave the bridge approaches with aggregate base and hot mix asphalt. Mary E Cantrell mecantrell@fs.fed.us Phone: 559 297-0706 Ext. 4890 Fax: 559 294-4833