Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2018 Measure M Low Impact Development Woolsey Street (REBID)
BID DATE
11/15/18 - 2:00
AGENCY
Berkeley
ESTIMATE
$1,500,000
SCOPE
Pacific Infrastructure Corp - $2,864,707 The work done under these specifications includes but is not limited to: traffic control, removal and disposal of pavement surfaces and base materials, removal and disposal of concrete curb and gutter, excavation and installation of cistern structure with associated inlet and outlet control structures and piping, installation of manholes and catch basins with associated storm drain pipeline, installation of stormwater treatment bio-swale with plantings, planting of trees, backfilling and compaction of excavations, hot-mix asphalt (HMA) paving, slurry sealing pavement, coordination of hydrant and water line removal and relocation with EBMUD, protection and relocation of underground utility services (e.g. gas, water, sewer, electrical, telecomm), installation of concrete curbs, sidewalk, curb ramps, and pavement markings, striping, and markers, protection of monuments, light poles, trees, catch basins and inlets, and cross drains as specified. dakagi@cityofberkeley.info
UPDATES