Blended RO Line Package 2A 2B
BID DATE
08/9/18 - 2:00
AGENCY
Escondido
ESTIMATE
$9,800,000
SCOPE
ORG BID RESULTS: James W Fowler - $8,771,992 MNR Construction - $9,373,777 EJ Meyer - $10,211,111 CCL Contracting - $10,989,690 JR Filanc Construction - $12,541,833 Kana Pipeline Engineering Subsurface - $12,856,152 LoneRock - $12,893,100 Wier Construction - $13,222,706 Burtech Pipeline Inc. - $18,814,886 The work consists generally of construction including: The installation of approximately 1.7 miles of 24-inch Ductile Iron Pipeline from Citrus to Moody, approximately 1.1 miles of 24-inch PVC Pipeline from the Oakhill Memorial Park cemetery to the Hogback Reservoir site, a 350,000 gallon bolted steel reservoir and associated yard piping, and retrofit of the existing 1.2-million-gallon reservoir and associated yard piping. Installation of two fiber optic conduits will also be included as a part of this project. Nelson Nuezca City of Escondido Utilities 201 N Broadway Escondido, CA 920252709 Tel:(760) 839-4284 Fax:(760) 738-5168 nnuezca@ci.escondido.ca.us
UPDATES