Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Improvement
BID DATE
05/24/18 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
This project generally consists of three improvement areas throughout the City: 1). Alarcon Alley, south of Aubrey Street between Alarcon Street and Pleasant Street. The unpaved alley will be paved with an inverted crown and 6-inch vertical curb with 6-inch roll curb at driveways. The inverted crown will include a valley gutter in the center of the roadway. Erosion control measures will be implemented to reduce sediment concerns associated with the area. 2). Goldenrod Way Spillway, includes replacement of the damage concrete spillway at Goldenrod Way and Panicum Drive intersection. The existing curb cut and spillway will be removed and replaced with a new curb cut and concrete spillway. The new curb opening will be widened to 13-feet and will taper down to an 8-foot wide concrete spillway. The 10-foot CMU wall east of the existing curb opening will be removed. The existing ground will be over excavated a minimum of 2- feet from existing ground and a riprap splash pad will be installed to dissipate energy as it enters the existing drainage channel. 3). Divinity Drive, the existing curb and gutter in the cul-de-sac has inconsistent grades and has created ponding throughout the cul-de-sac. The proposed improvement includes reconstructing the curb and gutter and repaving the cul-de-sac to obtain positive grades to the existing inlets. Questions: Contact Project Manager – Jeff Low Phone: 928-777-1130 E-mail: jeff.low@prescott-az.gov
PREBID
5/15/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT