Downtown Vallejo Streetscape Phase 4
BID DATE
05/17/18 - 2:00
AGENCY
Vallejo
ESTIMATE
$1,000,000
SCOPE
The work to be done includes: Providing traffic and pedestrian control, remove existing sidewalk and road pavement, install new curb & gutter and decorative sidewalk,remove and replace storm drain catch basins, remove and adjust utilities to new grades, coordinate with utility companies, remove existing street lighting, providing temporary safety lighting during construction, install new decorative street lights, install new landscape with Bio Swale/retention and irrigation system. The bidder shall include in his bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein Sam.kumar@cityofvallejo.net
PREBID
5/3/2018 2:00