Access the Full Project by Clicking here!
Bidjugde
JOB
Van Dyke Storm Drain Replacement
BID DATE
05/23/18 - 2:00
AGENCY
San Diego
ESTIMATE
$961,000
SCOPE
The work to be done as a part of this project includes the installation and realignment of a total of approximately 1,080 Linear Feet (LF) of reinforced concrete pipe (RCP) storm drains along Van Dyke Avenue between Ethelda Place and Monroe Avenue. This includes approximately 160 LF of 18’ RCP, 235 LF of 24” RCP, 390 LF of 30” RCP, 190 LF of 36” RCP, 35 LF of 42” RCP, and 70 LF of of 42” RCP with water tight joints. Also included is the construction of pedestrian curb ramps, abandonment of an existing storm drain outfall down a steep slope North of Ethelda Place, and grading of an eroding slope adjacent to the new outfall. Angelica Gil - 619-533-3622 AngelicaG@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT