Santa Clarita Valley Sheriffs Station Phase III (REBID)
BID DATE
12/20/18 - 11:00
AGENCY
Santa Clarita
ESTIMATE
n/a
SCOPE
ORG BID RESULTS: RC Becker and Son - $1,432,438 CA Rasmussen - $1,535,892 clearing and grubbing; demolition (access road pavement, storm drain, unidentified abandoned utilities, existing fencing); removal and relocation of existing utilities; excavation and fill; removal and re-compaction; stability fill with back drains; offsite stockpile; export; conformance with the City’s Construction and Demolition Materials Management Program; construction of retaining walls; modification of reinforced concrete storm drain pipes; modification of existing corrugated metal (CMP) pipe; installation of temporary fencing; construction of concrete drainage devices; slope protection; installation and maintenance of erosion control devices; implementation and management of City provided storm water pollution plan installation and maintenance of traffic control devices; and all appurtenant work as required by the plans and specifications. See the project drawings for more detailed description of the location and limits of the work. Heather Andrews - 661-255-4399 handrews@santa-clarita.com
UPDATES