Access the Full Project by Clicking here!
Bidjugde
JOB
Double Eagle II Airport Hangar Facility
BID DATE
05/15/18 - 1:30
AGENCY
Albuquerque
ESTIMATE
n/a
SCOPE
Description of Work: Construction of an 8,106sf hangar facility (open-story, mid-high bay, pre-engineered metal building with a hangar-type door on one side) with an attached 2,226sf space for administration and support. The administrative and support space includes an entrance lobby and waiting area, two enclosed offices, a crew/conference room, a locker room, restrooms, shower/changing areas, a break area, housekeeping, parts storage, data/server room and mechanical room. Site improvements include an entrance driveway and vehicular parking with minimal landscaping, apron paving on the opposite side of the facility sized to allow turning aircraft to enter the hangar, equipment screening (mechanical, utility and refuse), and utility extensions to the building. There are two Additive Alternates being bid also. Name, Address, Phone # of Architect/Engineer: Raybeau Richardson, PE raybeau.richardson@aecom.com
PREBID
5/2/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT