Access the Full Project by Clicking here!
Bidjugde
JOB
Parking Lot Expansion
BID DATE
05/7/18 - 3:00
AGENCY
Kostopulos Dream Foundation
ESTIMATE
n/a
SCOPE
emolition: The existing parking has a landscaped island with a fence, lighting, and signage which is to be removed and replaced with a narrower island pushed closer to the road. The asphalt around the old island and around the new proposed island will be saw-cut, and the asphalt, curb wall, landscaping, lighting, signage, and fence will be removed. The contractor will coordinate with Camp Kostopulos to determine which, if any, of the removed items and materials will be returned to Camp Kostopulos and which will be disposed of by the contractor. A portion of 12-inch flat containment curbing at the South end of the existing parking will be saw-cut and removed to allow the expansion to the south. Signage in that area will be removed and returned to Camp Kostopulos. North Parking Area Construction: A new landscape island will be built closer to the roadway as shown on the construction drawings. Six-inch concrete curb wall will be poured and a three-rail fence will be installed. The existing electrical lines will be extended to the new island and for the extension to the south. New light fixtures will be installed for the entire extent of the island. Topsoil will be brought in and new landscaping installed. It is anticipated that the landscaping will be drought-hardy and any watering to be done to establish the landscaping will be done by hand due to the difficulty of getting irrigation water to the island. Existing parking striping will be removed and new 4” white striping and ADA parking striping will be done as shown on the construction drawings. The required ADA signage will be installed as well as Camp signage, as directed by Camp Kostopulos. South Parking Area Construction: The new concrete-curbed landscape island from the north parking will be extended to the south with a small break to allow drainage from the roadway to get to the existing catch basin. The island for the south parking area will be narrower than the north island due to limited space between the road and Emigration Creek, but will still have three-rail fencing and similar landscaping to the north island. New lighting matching that in the north island will be installed. Flat 12-inch concrete containment curbing will be poured along the creek side of the parking matching that in the north parking area. To provide detention and stormwater filtering, a trench will be dug full length behind the containment curb, wrapped with filter fabric and filled with gravel up to the existing grade. The parking lot section shown on the construction drawings will be brought in and compacted, and the new asphalt will be installed. New 4” white striping will be done delineating the parking spaces and any signage required by Camp Kostopulos will be installed. The Contractor will be expected to clean up the site, remove the Erosion Control BMP’s and file the NOT for the UPDES permit. Throughout the process of construction, the contractor will be required to adhere to the requirements of the UPDES permit, all County ordinances, and OSHA requirements. kdf@campk.org
PREBID
4/30/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT