Access the Full Project by Clicking here!
Bidjugde
JOB
Rio Linda Blvd Bridge Replacement North Channel Dry
BID DATE
05/17/18 - 2:00
AGENCY
Sacramento County
ESTIMATE
$1,157,800
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for replacing the existing structurally deficient bridge, located along Rio Linda Boulevard approximately one mile south of Elkhorn Boulevard, with a new 60-foot long and 40-foot wide two-span precast bridge. Project work includes clearing and grubbing, habitat restoration, irrigation, rock slope protection, pavement grinding, tree removal, roadway excavation, bridge demolition, roadway approach work, aggregate base, asphalt pavement, traffic striping, bridge construction, installation of metal beam guard rail, bridge railings, and doing all other work specified on the plans and in the specifications. James Eslabon (916) 874-6743 eslabonj@saccounty.net
PREBID
5/2/2018 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT