Access the Full Project by Clicking here!
Bidjugde
JOB
Restore Infiltration Rate 7th St Basin 8th St Basin
BID DATE
04/18/18 - 4:00
AGENCY
Inland Empire Utilities
ESTIMATE
n/a
SCOPE
Infiltration rate restoration requires earthwork. Blading a thin layer of silt material from the surface of a groundwater recharge basin. Loading 6,350 cubic yards of silt material into trucks. Hauling the silt material to a (legal, beneficial re-use) site for use or disposal. Infiltration restoration then requires "ripping" the soil surface to a depth of 48" with a large dozer. The final step is smoothing the surface of the two sites, ensuring a constant grade to the (lowest point) outlet gate. Harlan Delzer - 909-993-1707 hdelzer@ieua.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT