SCOPE
Infiltration rate restoration requires earthwork. Blading a thin layer of silt material from the surface of a groundwater recharge basin. Loading 6,900 cubic yards of silt material into trucks. Hauling the silt material to a (legal, beneficial re-use) site for use or disposal. Infiltration restoration then requires "ripping" the soil surface to a depth of 48" with a large dozer. The final step is smoothing the surface of the site, ensuring a constant grade to the (lowest point) outlet gate. Harlan Delzer - 909-993-1707 hdelzer@ieua.org