Dorn Court Storm Drain Extension
BID DATE
06/20/18 - 3:00
AGENCY
Laguna Beach
ESTIMATE
$295,000
SCOPE
In general, the work comprises the installation of approximately 450 linear feet of storm drain pipe along Dorn Court. The work also includes the replacement of an existing catch basin, the construction of junction, manhole, and anchor structures, and the preparation and placement of a riprap pad in a remote location to the east of Dorn Court. The work includes, but is not limited to, trenching, the removal and replacement of A.C. pavement (patching) and street improvements as required to install storm drain facilities, surface drainage improvements, and traffic control as required to complete the work. The improvements are locatedin the City of Laguna Beach. tnguyen@lagunabeachcity.net