Access the Full Project by Clicking here!
Bidjugde
JOB
Idaho Street Rehabilitation Waterline Improvements
BID DATE
05/11/18 - 10:00
AGENCY
La Habra
ESTIMATE
$1,250,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of but is not be limited to Mobilization; Preparation and Implementation of Best Management Practices; Traffic Control; Excavation; Construction of Water Pipelines, Valves, Fittings, Hydrants, and Water Services; Removing Conflicting Pipes, Valves, and Fittings; Abandoning Existing Waterline and Water Services; Pavement Grinding; Leveling Course; ARHM; Asphalt Concrete Paving; Pavement Reconstruction; Concrete Work; Signage, Striping, and Markings; Traffic Loops Installation; and all associated work as identified on the construction plans. Joseph Khilla (562) 383-4164 City of La Habra

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT