Excavation Soil Exterior Site Work
BID DATE
05/10/18 - 2:00
AGENCY
Mesa Public Schools
ESTIMATE
$225,000
SCOPE
Excavation and/or backfill of soil. 2) Excavation of soil, installation of earth berms for and sand for playground areas. After the area is constructed, playground equipment will be installed (by certified playground installer), and then awarded Contractor shall return to the site, supply and spread the required amount of sand. 3) Grading and leveling of field and landscape areas. 4) Installation, relocation and/or disposal of sod, soil, sand, granite/gravel and earth berms. 5) Installation and/or cleaning of area drains, French drains and underground drain pipes. The Contractor shall provide labor and equipment capable of cleaning landscape area drain basins no larger than ten (10) cubic feet and connecting pipes not exceeding 8” diameter. 6) Installation, relocation, removal and/or repair of landscaping, including trees, shrubs/vegetation, sprinkler and flood irrigation systems and stump grinding. The Contractor shall furnish labor, equipment and the performance of all the operations necessary when incidental work requires relocation and/or repair of sprinkler and flood irrigation systems. Parts and materials for individual projects shall be quoted and approved by the Project Manager prior to performance of the work. The Contractor shall use labor rates bid. 7) Installation, removal and re-installation of block, chain link, and ornamental iron fencing. 8) Installation, removal and re-installation of concrete incidental to exterior site work. 9) Installation of new sheet metal skirting for new and relocated existing relocatable classroom buildings. When installing skirting on asphalt or concrete, the sill angle should be 8 x 20, 20 gauge. All work must be performed during non-school days and/or hours. 10) Installation of new rain gutters and downspouts for new relocatable classrooms buildings. 11) Remove and properly dispose of, sheet metal skirting from designated existing relocatable classroom buildings that will be relocated. Disposal is to be in accordance with City, State, County and Federal regulations 12) Installation and/or relocation of steps and ramps 13) Utility termination from designated existing relocatable classroom buildings. 14) Demolition and disposal of non-regulated construction debris, concrete and asphalt. Lauren Jaramillo, Procurement Specialist Supervisor Email: lajaramillo@mpsaz.org
UPDATES