Access the Full Project by Clicking here!
Bidjugde
JOB
Pennsylvania Avenue Utah Street Bus Stop Improvements
BID DATE
05/15/18 - 2:00
AGENCY
Fairfield
ESTIMATE
n/a
SCOPE
The work generally consists of, but is not limited to the following: installation of a new bus stop at the southwest corner of the intersection of Pennsylvania Avenue and Utah Street. The work includes the removal of existing landscaping, curb ramps, curb and gutter, fencing, asphalt concrete pavement, push buttons and push button posts, and crosswalk striping; relocation and modification of existing signage and traffic signal; and installation of new concrete pavement, curb and gutter, sidewalk, fencing, curb ramps, asphalt concrete, push button posts, conduit and conductors, crosswalk striping, and other work as shown on the Project Plans, as specified in the Contract Documents and as directed by the City Engineer.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT