SCOPE
The work to be done, in general, of installing Americans with Disabilities Act compliant concrete curb ramps, constructing concrete curb medians along Ashlan Avenue, removing trees, relocating driveway approaches, widening the intersection, removal and replacement of asphalt concrete pavement, installing curb and gutter, placing area lights, flashing LED pedestrian crossing signs, controller, electrical service equipment, conduits, and wiring. An additive bid item for embedded river rock surfacing in the median landscaping area is also included. DesignServices@co.fresno.ca.us