Access the Full Project by Clicking here!
Bidjugde
JOB
Train Station Expansion
BID DATE
05/10/18 - 2:00
AGENCY
Grover Beach
ESTIMATE
$1,940,900
SCOPE
In general, the Base Bid Work shall be to expand the train station site to the south to incorporate a bus passenger loading/unloading area, a bus shelter, and approximately 40 additional parking spaces. On site improvements include but are not necessarily limited to grading, paving, landscaping, site lighting, signage/striping, and the installation of curb, gutter, sidewalk, water and sewer lines, driveways and a retaining wall. The work also includes traffic control, water pollution control practices, pre- and post-construction survey monument protection and establishment, adjustment of pavement surface features (water utility boxes and valves, sewer manholes, storm drain manholes, and survey monument wells), clearing and grubbing of debris (plant, soil, etc.) within the Work limits, accessibility improvements, signage and installation of pavement markings. PublicWorks@groverbeach.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT