Access the Full Project by Clicking here!
Bidjugde
JOB
Saratoga Way Improvement
BID DATE
05/9/18 - 2:00
AGENCY
El Dorado County
ESTIMATE
$8,500,000
SCOPE
Grading, roadway demolition and construction, utility demolition and construction, construction of rock lined ditches, rock slope protection, rip-rap, and other erosion control (temporary and permanent), a 73- foot span precast concrete bridge system under Saratoga Way, a 22-ft span box culvert under Saratoga Way, a drainage basin with a 12-foot access road and emergency concrete spillway, one water quality treatment device (42-inch) and diversion bypass vault, structural retaining geowalls, basin CMU walls, 3- tier rockery walls, striping, traffic signal boxes and conduit work, and street lighting. The roadway will be closed for the duration of this project.
PREBID
4/23/2018 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT