Access the Full Project by Clicking here!
Bidjugde
JOB
(DESIGN BUILD) Oregon Street Parking Structure
BID DATE
06/25/18 - 8:00
AGENCY
Chandler
ESTIMATE
$24,000,000
SCOPE
Complete design and construction of the Project located on the west side of Arizona Avenue at the northwest corner of Chicago Street and Oregon Street. It is anticipated the Project will consist of a multi-story three-bay garage with entrances on Oregon Street and Chicago Street. Some architectural enhancements will be required. Design and Construction work are to be completed by Fall 2019. • Minimum 930 stall parking structure; • Realignment of Oregon Street as needed to the North and South to accommodate the required size of the structure and to meet City requirements; • Realignment of Chicago street and improvements to meet City requirements’ • Utility relocations and extensions as needed; • Entrances to the parking structure on Chicago and Oregon streets; • Protection of the alleyway and neighborhood to the West of the Project site; • Development of the parking structure so as to allow for modification into retail use on the first (ground) floor in the future; • Design of the Project so as to provide an enhanced pedestrian connection between downtown Chandler and the Site 6 development to the East of the Project site; • City expectation is the parking structure will be constructed of cast in-place concrete or precast, or a combination thereof; • Design of the parking structure so as to provide a potential future bridge connection from one of the parking decks across Oregon Street to the Site 6 development to the East of the Project site; and • Façade treatments shall be consistent with the area’s architecture and follow City directed concepts. paula.brown@chandleraz.gov
PREBID
4/13/2018 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT