Access the Full Project by Clicking here!
Bidjugde
JOB
Verde Village Improvement
BID DATE
04/26/18 - 1:30
AGENCY
Yavapai County
ESTIMATE
$885,300
SCOPE
The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for roadway reconstruction improvements at Camino Real and asphaltic concrete overlay on Camino Real, Peila Avenue, and Monte Tesoro Drive in Verde Village. The combined overlay length is approximately 1.6 miles and roadway reconstruction is approximately 800 feet. Major project work includes approximately: 2,900 cubic yards of roadway excavation, 840 cubic yards of aggregate base material, and 4,020 tons of asphaltic concrete. Other associated work includes, but is not limited to: 2,842 square yards of full-depth bituminous pavement removal by milling and haul, 1,602 square yards of bituminous pavement removal by milling (up to 2”) and haul, 3,210 square yards of subgrade preparation with type II geogrid, 492 tons of shouldering material, installation of 32 signs, shoulder build-up and grading, drainage improvements with ditch grading and rip-rap installation, driveway improvements, and roadway striping. All in accordance with the plans, specifications and contract documents. A Pre-bid Meeting (MANDATORY) is scheduled for 10:00 a.m. on April 17, 2018, in the Yavapai County Public Works Department Ready Room in Camp Verde, located at 4000 North Cherry Rd., Camp Verde, AZ 86322. ENGINEER'S ESTIMATE: $885,300.00 MaryAn.Sala@co.yavapai.az.us
PREBID
4/17/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT