Access the Full Project by Clicking here!
Bidjugde
JOB
Eastern Irrigation Water System
BID DATE
04/24/18 - 2:00
AGENCY
San Juan Capistrano
ESTIMATE
n/a
SCOPE
The Eastern Irrigation Water System project will furnish irrigation water to a facility located on the East side of the City of San Juan Capistrano. The two main elements of the project are a new connection at the Point of Delivery (POD), located east of the intersection of Calle Arroyo and La Novia Avenue, and modification of existing facilities and new connections at the City’s existing Well Site 5 facility, which is located approximately 1,000 feet to the Northeast of the POD. Project elements at the POD include an 8 inch connection to the City’s existing 16” conveyance pipeline, approximately 40 lineal feet of 8 inch PVC piping, a 6 inch diameter, above grade metering and flow control facility and concrete housekeeping pad, connection to the existing above grade and below grade customer side piping, a new electrical service meter pedestal, underground electrical conduit and wiring to an electrical panel serving the meter and flow control valve, and a communications antenna as shown on the Contract Documents. mmarquis@sanjuancapistrano.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT