Access the Full Project by Clicking here!
Bidjugde
JOB
Grand Blvd Initiative
BID DATE
05/8/18 - 2:30
AGENCY
South San Francisco
ESTIMATE
$6,002,300
SCOPE
The work consists of traffic control; excavation; removals; hot mix asphalt paving; slurry seal; concrete curb, gutter, and paving; pervious concrete paving; signing and striping; utility adjustments; storm drainage modifications; bioretention planting and irrigation; and signal and lighting modifications, located on El Camino Real at McLellan Drive to 300 feet south of Kaiser Way (north location), and at the Chestnut/Westborough Avenue intersection to 250 feet north of Arroyo Drive (south location) in South San Francisco, CA.
UPDATES