Access the Full Project by Clicking here!
Bidjugde
JOB
Taxiway V Reconstruction
BID DATE
07/18/13 - 2:00
AGENCY
PMGAA
ESTIMATE
n/a
SCOPE
The project is funded by grants from the Federal Aviation Administration (FAA), the Arizona Department of Transportation (ADOT) and the Phoenix-Mesa Gateway Airport Authority (PMGAA). The sponsor of the project is PMGAA. The intent of this project is the construction of the Taxiway V Reconstruction as presented on the plans and specifications. The Taxiway V Reconstruction is located southwest of Runway 12R-30L and adjacent to an existing apron. The Project consists of the construction of approximately 12,950 square yards of Portland Cement Concrete (PCC) pavement and includes site grading, earthwork, drainage, crushed aggregate base course, asphalt concrete shoulder pavement, pavement marking, communications relocation, taxiway edge lighting, and guidance signage relocation. The items associated with this project include the following: 1. Construction of approximately 900‘ x 75’ LF of Taxiway Apron consisting of approximately 12,950 SY of Portland Cement Concrete Pavement (PCCP), asphalt base course, and lime stabilized subgrade; 2. Construction of asphalt concrete shoulder pavement section; 3. Pavement removal and replacement for the service road; 4. Relocation of communication infrastructure and cabling; 5. Placement of taxiway centerline, edge pavement markings, and service road markings; and 6. Installation of new, taxiway edge lights, and relocation of existing taxiway guidance signs. A Mandatory Pre-Bid Conference will be held at Phoenix-Mesa Gateway

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT