Access the Full Project by Clicking here!
Bidjugde
JOB
Detention Basin Mid
BID DATE
06/27/13 - 2:00
AGENCY
PMGAA
ESTIMATE
$1,750,000
SCOPE
The Detention Basin Mid project will be funded by a grant from the Arizona Department of Transportation (ADOT‐MPD Aeronautics Group) and the Phoenix‐Mesa Gateway Airport Authority (PMGAA). The intent of the project is to construct a new stormwater Detention Basin between Runways 12R‐30L and 12C‐30C, and approximately 4,000 feet of related outfall storm drain line parallel with the runways, with the outfall into the existing Detention Basin North. The project has been broken into a Base Bid and Additive Alternate No. 1 bid. The major items associated with this project include the following: Base Bid (Schedule I): 1. Construction of approximately 59,000 cubic yard detention basin. Detention Basin Mid PMGAA Solicitation No. 2013‐021‐IFB PMGAA Project No. 4 Notice of Invitation for Bid Page NIB‐2 2. Construction of approximately 4,000 lineal feet of various sized storm drain pipe (Class V RGRCP). 3. Demolition of approximately 2,400 square yards of existing asphalt service road. 4. Construction of approximately 4,400 square yards of new asphalt service road. 5. Construction of miscellaneous storm drain structures. Add Alt No. 1 Bid (Schedule II): 1. Construction of approximately 2,600 LF of 42‐Inch storm drain pipe (Class V RGRCP). 2. Construction of miscellaneous storm drain structures.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT