Access the Full Project by Clicking here!
Bidjugde
JOB
2018 Measure J L Pavement Rehabilitation
BID DATE
04/24/18 - 2:00
AGENCY
Orinda
ESTIMATE
$14,300,000
SCOPE
The work to be performed generally consists of pavement rehabilitation and storm drain improvements of 66 residential road segments in City of Orinda and 10 residential road segments in Town of Moraga. The pavement treatment methods include Full Depth Reclamation (FDR) with cement and Mill & Overlay treatments with base failure repair. Work is to include, but not limited to, pulverization of the existing asphalt concrete (AC) roadway and subgrade, earthwork export, base stabilization with cement, and repaving with new hot mix asphalt; replacing storm drain pipes using open trench, rehabilitating storm drain pipes using trenchless technology by installing Cured In Place Pipe (CIPP) liner, performing post construction CCTV of storm drain pipes, replacement of curb, gutter, concrete or asphalt lined ditches and asphalt dikes, construction of curb ramp, pavement striping, lowering and raising of utility covers fkhorashadi@cityoforinda.org
UPDATES