Buena Outfall Forcemain Phase III
BID DATE
05/15/18 - 2:00
AGENCY
Vista
ESTIMATE
$9,935,000
SCOPE
Without intending to limit the content of the scope of services expected to be performed by the Contractor, the Work generally includes installing 10,300 LF of 24-inch and 2,700 LF of 26-inch butt fused C906 HDPE (DR 11) sewer forcemain. Additionally, 4,200 LF of 24-inch, 1,500 LF of 30-inch and 150 LF of 16-inch butt fused C906 HDPE (DR 17) sewer gravity pipeline will be installed. All HDPE pipelines shall be butt fused unless otherwise noted. There will be three (3) odor control facility sites along the project alignment to treat noxious gases, of which two (2) will require new SDG&E metering service, new water service and meter, and a variation of 2” ᴓ, 4” ᴓ, 6” ᴓ and 8” ᴓ PVC drain and foul air piping as denoted on the Plans. Additionally, Site No. 1 and No. 2 will require a new CMU block structure around the proposed odor scrubber with internals as denoted on the Plans. Richard Caldwell City of Vista Engineering 200 Civic Center Drive Vista, CA 920846275 Tel:(760) 643-5418 x5418 Fax:(760) 639-6112 rcaldwell@cityofvista.com
UPDATES