Tin Town Drainage Road Improvement (REBIDX3)
BID DATE
02/8/19 - 3:00
AGENCY
Bisbee
ESTIMATE
$350,000
SCOPE
ONLY ONE-BID RECEIVED FOR 3RD REBID; ALTERNATES AS FOLLOWS FOR LOW BIDDER 21,005; 17,745; 49,400; 20,795; 98,080; 155,290 3RD TIME NOT A CHARM BID RESULT: KE&G Construction - $716,771 Whelcon Contractors - $999,014 2ND BID RESULT: KE&G Construction - $141,215 Accelerated Construction Excavating - $144,880 ORG BID RESULTS: KE&G Construction - $245,026 MD Merrett - $319,599 The Tin Town roadway and drainage project consist of reconstruction of roads with an inverted crown to improve drainage, erosion control, manhole adjustments and street signing. There will also be an installation of open concrete drainage channels at the north pond and the southern drainage outlet. The outlet at the south will include gabions and rip-rap structure.; https://www.soudermiller.com/bid-requests/tin-town-street-and-drainage-project-bisbee-arizona/files Alonzo.martinez@soudermiller.com