Access the Full Project by Clicking here!
Bidjugde
JOB
Pinnacle Peak Road 45th Ave 35th Ave Paving Storm Drain Improvements
BID DATE
05/1/18 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$8,236,741
SCOPE
Pinnacle Peak Road: 45th Avenue to 35th Avenue project consists of constructing new roadway paving and storm drain improvements on Pinnacle Peak Road from 45th Avenue to just west of 35th Avenue, and constructing a new storm drain on 43rd Avenue extending north from Pinnacle Peak Road to Misty Willow Lane. The work includes: subgrade preparation and constructing new asphaltic concrete roadway pavement; new concrete curb and gutter, ADA compliant concrete sidewalk, curb returns, concrete driveway entrances; new concrete box culvert crossings, concrete wing walls, concrete headwalls with brick veneer facing, concrete channel lining, new storm drain mainline pipe, storm drain manholes, storm drain connector pipes and catch basins; trenching for underground street light circuits; installation of new traffic signal poles, signal equipment, and traffic signal conduits; installation of new LED street lights and LED luminaires; new landscaping and irrigation system, decomposed granite landscape ground cover; and other required work items. Please contact Michael N. Soto III for any questions regarding this project at 602 256-5692 or michael.soto@phoenix.gov
UPDATES