Access the Full Project by Clicking here!
Bidjugde
JOB
Arizona Forest Hwy 39: Mt Lemmon Storage Yard
BID DATE
06/25/13 - 11:00
AGENCY
Pima County
ESTIMATE
$750,000
SCOPE
This project includes all labor, materials, and work for the new construction of pre-engineered structures for the Arizona Forest Highway 39, Tucson, AZ: Mt. Lemmon Storage Yard (4MTLYD) located on Arizona Forest Highway #39 (Catalina Highway) pursuant to the specifications and plans by Swaim Associates, Ltd. dated February 28, 2013. The primary building will be approx. 3,344 GSF and will consist of 2 parking bays, crew support with a small office and break room and a single crew restroom facility and equipment storage. In addition to this, approx. 10 covered parking spaces will be developed to protect vehicles and equipment from the weather. The facility will also include a motor generator set to accommodate facility electrical loads during prolonged power outages known to occur on Mt. Lemmon. Construction will also include site work, curbs and storm drainage, paving, fencing and utility connections. This project is funded entirely by U.S. Department of Transportation Federal Highway Administration Public Lands Highways Discretionary Funds. Davis-Bacon Prevailing Wages apply. Buy America certifications on all steel, iron or manufactured products showing the products were manufactured domestically will be required. Estimated construction cost for the project is between $700,000.00 and $800,000.00. The project shall be complete and in place within 270 calendar days from Notice to Proceed. All work required to procure, review and approve pre-engineered structures may commenc

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT