Sly Park Road Clear Creek Crossing Bridge Replacement
BID DATE
04/20/18 - 2:00
AGENCY
El Dorado County
ESTIMATE
$3,300,000
SCOPE
Construction of a cast-in-place pre-stressed concrete slab bridge over Clear Creek; removal of the existing structure; grading and paving for the new bridge approaches and re-aligned roadway; roadway and ditch excavation; signing and striping; and drainage system improvements. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. Brian.Franklin@edcgov.us http://www.questcdn.com/