Access the Full Project by Clicking here!
Bidjugde
JOB
West McKinley AC Pavement Overlay Marks Hughes
BID DATE
05/1/18 - 3:00
AGENCY
Fresno
ESTIMATE
$400,000
SCOPE
The scope of work includes, but is not limited to, conform grinding the existing asphalt concrete pavement and overlaying with new hot mix asphalt concrete; replacing pavement striping and markings; replacing traffic signal loop detectors; raising sewer and storm drain manholes and water valves to finished grade; upgrading curb ramps at the returns in accordance with the current ADA requirements; removing and re-installing any affected street traffic signs; and removing & replacing any affected concrete curb, gutter and sidewalk, complete in place. Mike Brown - 559-621-1165 Mike.Brown@Fresno.gov
PREBID
4/10/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT