Access the Full Project by Clicking here!
Bidjugde
JOB
Pinecrest Transfer Station Improvement
BID DATE
04/5/18 - 2:00
AGENCY
Tuolumne County
ESTIMATE
n/a
SCOPE
The work to be done consists, in general, of sawcutting and removal of existing asphalt concrete pavement; construction of reinforced concrete retaining wall, vertical curb, curb and gutter, and apron; construction of drain inlets and catch basin assemblies; construction of rock-lined swale; regrading of existing slopes; installation of aggregate base, hot mix asphalt pavement and asphalt concrete dike. druby@co.tuolumne.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT