Access the Full Project by Clicking here!
Bidjugde
JOB
UAMC South Campus Parking Lot Improvements
BID DATE
05/29/13 - 2:00
AGENCY
Pima County
ESTIMATE
$625,000
SCOPE
As described and indicated in the Plans by Pima County Facilities Management dated April 2013, this Project located at 2500 E. Ajo Way, Tucson, AZ consists of the following work: Base Bid: Areas A thru E – Remove existing asphalt and provide new asphalt surface in areas ‘A’ and ‘B’, crack seal and seal coat existing asphalt pavement in areas ‘B’, ‘C’, ‘D’, and ‘E’, and restripe parking areas and drive lanes. Remove damaged asphalt, re-build subgrade and place new asphalt in areas indicated on drawings. This project also includes three additive alternates: Additive Alternate #1: Area ‘F’, sheet AS2.5- Crack seal and seal coat existing asphalt pavement, and restripe parking areas and drive lanes. Remove damaged asphalt, re-build subgrade and place new asphalt in areas indicated on drawings. Additive Alternate #2: Area ‘G’, sheet AS2.6 - Modify 8 speed humps per detail 2/AS2.6, crack seal and seal coat existing asphalt pavement, and restripe parking areas and drive lanes. Additive Alternate #3: Area ‘H’, sheet AS2.7 - Modify 8 speed humps per detail 2/AS2.6, crack seal and seal coat existing asphalt pavement, and restripe parking areas and drive lanes. The total construction cost of this project is estimated at $600,000-$650,000 including the Alternates. All work for the project, including alternates, is to be completed in 120 calendar days from the date of Notice to Proceed. Barring unforeseen circumstances, award to the responsible b

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT