Access the Full Project by Clicking here!
Bidjugde
JOB
2018 Arcata ADA Bus Stop Improvements
BID DATE
04/12/18 - 11:00
AGENCY
Arcata
ESTIMATE
$150,000
SCOPE
he WORK consists of furnishing all labor, materials, equipment, incidentals and implementing all work required to perform asphalt paving, concrete work, and drainage improvements at the Transit Center, in the City of Arcata. This work includes, but is not limited to: Saw cutting (AC & PCC), Portland cement concrete (PCC) demolition and removal, PCC construction, installation of drainage structures and pipes, installation of handrails, asphalt concrete (AC) shear-in, curb and gutter wedge and roadway conform grinding, asphalt concrete overlay, installation of truncated domes, removal of drainage line and inlets, sign and post relocation, roadway striping and legends (complete and in place), and raising covers (manhole, valve, cleanout, and monument) to grade.
UPDATES