Access the Full Project by Clicking here!
Bidjugde
JOB
FY18 Pavement Preservation 015
BID DATE
03/22/18 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
This project generally consists of crack sealing on an as needed basis; pavement repairs; the adjustment of utility covers to finish grade; restoration of disturbed traffic striping; curb, gutter, handicap ramps, and valley gutter replacements; shoulder repair; and subgrade restoration. The project also includes the placement of Type III Microsurfacing and Chip Seal with Polymer Modified Pavement Sealer; and placement of Asphalt Maltene Rejuvenator on streets, as shown on the plans
UPDATES