Access the Full Project by Clicking here!
Bidjugde
JOB
SB1 Curb Ramp
BID DATE
03/29/18 - 3:00
AGENCY
Vallejo
ESTIMATE
n/a
SCOPE
The work to be done includes: Saw cutting; removing existing concrete curb/gutter, sidewalk, and curb ramps; excavating subgrade; legally disposing of existing PCC and AC pavement; compacting subgrade; placement and compaction of AB cushion; placement of PCC curb, gutter, sidewalk, and ramps; installing new signs and posts; removing existing sign posts; removing and replacing pavement markings and striping; adjustment and installation of utility boxes; and traffic control;The bidder shall include in his bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein.
PREBID
3/20/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT