Access the Full Project by Clicking here!
Bidjugde
JOB
Centennial Park Phase I Improvements
BID DATE
03/27/18 - 2:00
AGENCY
El Cerrito
ESTIMATE
$300,810
SCOPE
Mobilization; Installation of temporary construction perimeter fence; Traffic control; SWPPP; Demolition and Proper disposal of existing AC paving, rock wall, concrete stairs, existing play equipment, trees and site appurtenances not for salvage; Removal and Salvage of existing play structures; Perform tree pruning and vegetation cutting under City’s guidance; Site clearing and grubbing; Survey staking and Grading work; Installation of concrete paving, foundations, and stairs; Installation of new railings; Installation of new and salvage play structure, engineered wood fiber and sand bedding; Installation of boulders and miscellaneous logs; Installation of aggregate paving; Installation of drainage piping; Installation of new site furnishing such as benches, trash receptacles and bike racks; Relocation of street signs; Installation of new rail fence and site wood headers; Installation of new irrigation system and modification of existing irrigation; Planting of new trees, turf seed mix and installation of mulch and such other items or details that are required by the plans and specifications to be performed, placed, constructed, or installed. abernardes@ci.el-cerrito.ca.us
PREBID
3/15/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT